A 1500 W industrial generator prototype
Natural-gas conditioning, stacks, thermal design, controls and safety integrated into one installation.
This research tradition has already produced materials, cells and experimental systems. The next step is to assemble and test a complete SOFC system operating on natural gas.

Support funds equipment, the team’s work and validation of the complete system. Test results will provide a basis for later engineering scale-up.
Natural-gas conditioning, stacks, thermal design, controls and safety integrated into one installation.
Measured operating parameters, durability testing and documented results for the next engineering decisions.
Repeatable processes, equipment and a team for future 5, 10 and 25 kW base assemblies. Those stages require separate funding.
The planned goal and timeline come from the donor booklet dated 13 October 2026. The budget, procurement and schedule will be updated before implementation. This is not a live total raised or a generator preorder offer.
Stop Russian Terror Foundation coordinates the Stage I donor campaign. To support this SOFC programme specifically, contact Herman Obuhov for current instructions and to agree on the designation of your contribution.
Contact the coordinator ↗Foundation’s general giving page ↗The foundation lists general giving options there; it does not identify a separate payment form for this programme.
Materials, measurement equipment, manufacturing services and testing support are also valuable. The ZIRCONIA UKRAINE team can discuss an in-kind contribution.
Contact the team ↗